my account  log out
 
  Invalid Buy Request Report             Home       

Invalid Buy Request Report

Subject: Ball Mill
Message: Ball MillThis ball mill has been changed the original mill structure,Website:http://www.zhengkemachine.com, make the body, chassis integration, when installation, it can be hanging on foundation plane by one time. Main bearing adopts double spherical roller bearing, can reduce energy consumption by 30%. Forced discharging from the grid type, can improve the grinding granularity, can increase the capacity of 15-20%.Technical Parameter:ModelCapacity      (t/h)Form      Of MillForm of      TransmissionPower      (KW)Reutction DriveWeight      (t)RemarkTypeRationΦ2.2X7m8-9OpenEdge380ZD70554Without      motorΦ2.2X7.5m10-11OpenEdge380ZD70563Φ2.2X8m10-12OpenEdge380ZD70565Φ2.2X9.5m14-16OpenEdge475ZD70570Φ2.4X10m19-19OpenEdge630JR755.6494.5Φ2.4X11m19-21OpenEdge630RZD806.399.2Φ2.6X13m21-23OpenEdge800MBY7107.1115.2Φ2.6X13m28-32OpenEdge1000MBY8007.1148Φ2.6X13m28-32OpenCenter1000MBY10019.5101.73Φ3X12m32-35OpenEdge1250MBY9007.1168.6Φ3X2m34-37OpenEdge1400MBY9007.1172.26Φ3.2X13m45-50OpenEdge1600MBY10007.1196.26Φ3.8X13m60-62OpenCenter2500MBY25016.5204Φ4.2X13m85-87OpenCenter3530JQS355015.6204
Reason:
Copyright © toextrade Inc. All rights reserved. Contact us