Message: | China turbine parts Bearing ER207-20
The use of advanced technology, absolutely first-class service quality, is our constant faith over the years. Production is in strict accordance with national standard, line standard and DEC technical standards. The main technical backbone are retired senior engineer and senior technicians from DEC, who has participated in the design, manufacture and installation of Gezhouba, Ertan, Three Gorges and other power plants. We have served hundreds of hydropower stations, thermal power plant overhaul, and technical transformation to provide high quality equipment, construction design, installation, spare parts, and after-sales service.
We have more spare parts and equipments for power plant. Check the list below:
If you don't find the needed spare parts in the list, please feel free to contact us.
#DF-Bearing ER207-20-DF
LVDT Displacement Transducer Sensors 2000TD
sensor de lvdt HTD-350-6
output shaft speed sensor D-065-02-01
Magnetic Proximity Sensors DF6101-005-065-01-05-00-00
thermocouple temperature meter TE-203
automatic lubrication pump 100AY67X8
lcd speedometer digital D521.02-G
Splice D-436-36
Resistance Thermometers WRNKD2-04A-II
piston vacuum pump A3H56-FR01KK-10
non-contact displacement sensor TD1000
rtd cable WZPK2-213 PT100
turbine speed sensor ZCS-03
Magnetic Speed Sensors HZSP-475-50-10-HR
variable vane pump F3-20V12A-1C22
dc heating element W05A0123A
tube cooler GLC3-4/1.6
lvdt 0-300 10000TDGN-50-01-01
best water filter MSL-125
dc speed control sensor CS-1 G-080-03-1
filter hydraulic servo CFRI-250×10Q2
linear displacement transducer B151.36.09G12
LVDT Position Sensors C9231119
k type thermocouple 1200c WREK2-230
300mm pt100 WZPK2-430NM
lvdt displacement sensor inductive sensor 3000TDZ-A
industrial displacement sensor DET-700A
heating cartridge heaters HY-GYY-2.4-380V
Bearing ER207-20
DFYL-2021-10-13-MY
|