Message: | The use of advanced technology, absolutely first-class service quality, is our constant faith over the years. Production is in strict accordance with national standard, line standard and technical standards. The main technical backbone are retired senior engineer and senior technicians, who has participated in the design, manufacture and installation of Gezhouba, Ertan, Three Gorges and other power plants. We have served hundreds of hydropower stations, thermal power plant overhaul, and technical transformation to provide high quality equipment, construction design, installation, spare parts, and after-sales service.
If you don't find the needed spare parts in the list, please feel free to contact us.
#DF-Generator Carbon Brush National 634 64*32*32 mm, Cable 200mm, Cable Lug 30 mm-DF
lvdt 0-300 191.36.09.17
Gear rpm sensor ZS-04 G-075-03-01
pp filter cartridge making machine DlS-400
rpm gauge HY-TACH
mechanical seal 90NY/JXMF
liquid ring vacuum pump P-1761
dc centrifugal pump YCZ50-250
lvdt displacement sensor HL-3-100-15
lvdt displacement transducer FRD.WJA2.308H
lvdt working principle TDZ-1E-22
lvdt probe A156.33.31.24
thermocouple wzpk 230 pt100 WRNK2
thermocouple type WRNK2-191M
LVDT Displacement Transducer Sensors HTD-100-3
high temperature sensor WZPM2-201T
differential pressure Regulating valve ZZCN-10B DN40 PN1.0
thermocouple temperature meter W08B0691A
3 wire rtd WZPM2-001, DZ3.5.1-1995
oil filter tool 3PD140×250E15C
vacuum oil pump M01225.OBMCC1D
Wiper ring Pos.97
thermowell flange TE-404
Analog Linear Displacement Sensor HL-6-300-15
inline water filter KLS-I
HP trip assembly HTBA600A.0
lvdt-sensor LVDT-450-3
hydraulic spin on return line filter FBX-1000×20
thermocouple temperature sensor WRK2-001
3 wire rtd W09A0796A
|