Message: | AAK hydraulic valve blocks are processed with compound cutting tools, and the production efficiency is nearly 50% higher than that of peers. At the same time, the precision of hydraulic valve blocks is also improved by 5%. AAK completed the urgent order of 1,000 hydraulic valve blocks in only 30 days, while most hydraulic valve block manufacturers can't control the processing technology of compound cutting tools. German customers are also attracted by it.
It's a little strange that since the second half of last year, many inquiries about hydraulic valve blocks have an urgent delivery date. They need to be shipped within 20 days or finished within 30 days. For non-standard hydraulic valve blocks, from production drawing design, sample, life test, production to delivery, the vast majority of hydraulic valve block manufacturers need 45-60 days. But this is desperate for the customers with urgent order of hydraulic valve blocks, and Bach in Germany is one of them.
Bach wanted to purchase 1,000 pcs of hydraulic valve blocks a few weeks ago. His customer requested that the goods be delivered to Germany in 50-60 days, but the quotation of the local factory in Germany exceeded his budget. He could only find the manufacturer of hydraulic valve blocks in Ningbo, that is, goods need to be shipped in 30 days. Bach contacted nearly 20 hydraulic valve block manufacturers, but none of them can complete the production of 1,000 hydraulic valve blocks in 30 days.
A few days ago, we received Bach's message on AAK website (www.aakindustry.com): I saw an article on B2B that "AAK processes hydraulic valve blocks with compound cutting tools, and the delivery time is 30 days faster than peers". Can AAK complete non-standard hydraulic valve blocks in 30 days? After communication, I learned that Bach was troubled by the delivery date of hydraulic valve blocks. I directly told him that the 30 days of lead time for 1,000pcs of hydraulic valve blocks is enough for AAK.
|