my account  log out
 

PPR Cold And Hot Water Pipe Fitting Mould

Create: 12/27/2017
Expired Date:12/28/2019
Category: Electronic
Message:Specifications of PPR cold and hot water pipe fitting mouldNamePPR cold and hot water pipe fitting mouldMould materialP20, 718, 2738Mould baseLKM, KAIJI STANDARDCavitySingle/multiRunnerHot/coldDesign softwareCAD, CAM, CAE NX UGPlastic materialPPRMould life500, 000-1, 000, 000 shotsDelivery time30-60 daysPackingWooden caseMould quality controlFor the Q/C of mold, there are 3 steps:1.Mould Material Q/C- Mould Steel Checking(Hardness, flaw detection)- Mould Standard Spare Parts Checking(hardness, size, flaw checking)2.Mould Making Process Q/C - design checking (part design, mould design, mould engineering drawing)- Each part of mould’s size checking after machining according to 2D drawing- mould testing(check mould running condition)3.check with customer’s requirement again before mold shipping.Mould  maintenancea)When the mould is vacant, spray the anti-rust oilb)To clean the gate and cooling system regularlyc)Avoid to use recycled material if the mould is suitable for virgin material onlyAfter-Sale Servicea)Engineering and one interpreter can be sent to customer’s factory for first running.b)one-year after-sale technique supportPrimary Competitive Advantages: 1. Approved Quality2. On-Time Delivery3. Reasonable Price4. Experienced Staffs5. Reliable Post-Service6. Good Reputation url:http://www.pipefittingmoulds.com
City:Taizhou[CN] 
Location:
 Is this a real buying request?
 

return back

Copyright © toextrade Inc. All rights reserved. Contact us