Message: | Chat Now
Product Details:
Rapid Deployment Solutions
RDS is a modern evolution of tradtional reinforced concrete foundation, eliminating phased of work such as :excavation,formwork,reinforcement,pouring concrete and embankment,construction time is reduced to 1-2days.
Debao has designed and manufactured a temporary or permanent rapid deployment tower that can be installed in 1 day with or without the use of a revolutionary anchoring system.
rapid deployment solutions
• Tower Size: 25m-40m
• Debao Rapid Deployment Sites can be completed in 1 or 2 days, Minimal equipment needed
• Foundation can be accomplished with helical anchors or whatever is easily available for ballast, no need to disturb the soil
• Electrical easily installed with no trenching needed
• Civil work problems cut down significantly, no need to worry about soil conditions or water table
• All equipment installed directly on the base with no need for additional concrete slabs and long cable trays
• Security fence, foundation and tower bundled together
• Reduce your construction cost
• Reduce your construction timeline
• Relocate to another site fast
• Engineered and built to withstand the most demanding environments url:http://www.db-steel-tower.com |