| Message: | Chat Now
Product Details:
Rapid Deployment Solutions
RDS is a modern evolution of tradtional reinforced concrete foundation, eliminating phased of work such as :excavation,formwork,reinforcement,pouring concrete and embankment,construction time is reduced to 1-2days.
Debao has designed and manufactured a temporary or permanent rapid deployment tower that can be installed in 1 day with or without the use of a revolutionary anchoring system.
rapid deployment solutions
•  Tower Size: 25m-40m
•  Debao Rapid Deployment Sites can be completed in 1 or 2 days, Minimal equipment needed
•  Foundation can be accomplished with helical anchors or whatever is easily available for ballast, no need to disturb the soil
•  Electrical easily installed with no trenching needed
•  Civil work problems cut down significantly, no need to worry about soil conditions or water table
•  All equipment installed directly on the base with no need for additional concrete slabs and long cable trays
•  Security fence, foundation and tower bundled together
•  Reduce your construction cost
•  Reduce your construction timeline
•  Relocate to another site fast
•  Engineered and built to withstand the most demanding environments url:http://www.db-steel-tower.com |