Message: | Krischnan is from a hydraulic equipment manufacturing company in the United States. He has been engaged in hydraulic manifold procurement for only 1 year. In the second half of last year, they developed a hydraulic oil pump to promote for new. The hydraulic manifold used comes from the design of their engineers. They chose a hydraulic manifold manufacturer who has worked with them for 5 years to try samples. 2 months later, the commissioning was not smooth. After the equipment was started for a period of time, the pressure supply of the oil pump was unstable, resulting in high energy consumption of the equipment, which had no advantage over the peers. The boss asked that the problem be solved within 3 months. The engineer asked Krischnan to contact the original hydraulic manifold manufacturer to solve the problem, but the manufacturer only had production capacity and can not offer solution. Krischnan was worried that the technical department blamed the purchase for the abnormal test run and had to check with many hydraulic manifold manufacturers. 1 week later, only one hydraulic manifold manufacturer replied that the manifold might need to be redesigned, but he was not sure. Krischnan was worried about time being wasted day by day.
|