Message: | Asa from Israel contacted me a while ago. This guy hasn't contacted hydraulic manifold manufacturer AAK for 3 months. I realized he was facing difficulties before I opened the email. Asa requested hydraulic manifold manufacturer AAK to complete a test order for 3 pcs of complex hydraulic manifold blocks within 30 days. After communication, it was learned that the hydraulic manifold blocks were purchased and then assembled onto the hydraulic manifolds in Israel. The customer is a hydraulic manifold manufacturer in Israel. Asa contacted 6 hydraulic manifold manufacturers in Ningbo, all of which require 50 days or more, but his engineer can only give him 30 days, so he needs AAK's help. He can provide machining drawings for the hydraulic manifold block, not just design drawings of the hydraulic manifold block. |