Message: | 1. The production process:
Raw material (strip) →feeding→Cutting and Welding →Horizontal Spiral Accumulator → Forming, HF welding, Deburring, Cooling, Sizing, Straightening →STD Cold-cutting saw →Transmitting → Packing → Storage
2. Adapt materials:
Hot rolled or cold rolled steel strip
Material: Low carbon steel and low alloy constructional steel
δs≤345Mpa δb≤610Mpa
3. Processing steel pipe size range:
(1) Processing range: Round pipe Φ20-Φ32mm.
Square&Rectangular pipe 10x10—25x25
(2) Thickness of Round pipe: 0.5-1.5mm
Thickness of Square&Rectangular pipe: 0.5-1.0mm
4. Installed capacity: 200KVA
5. Water consumption: 20m3/h
6. Solid-state high-frequency Welder: 100KW
7. Workshop Request: length, width and height 30-50m X 12m X 5m
8. Forming speed: 80-120m/min
For more details please contact our company immediately,thank you! |