my account  log out
 

Beneficiation Plant EPC,Mineral processing plant engineering and construction

Create: 04/03/2018
Expired Date:04/01/2020
Category: Mining&quarrying [Equipment&Machinery]
Message:Beneficiation plant EPC Sinonine provides clients with services of beneficiation test, engineering design, equipment supply, installation & commissioning and technical training etc., and solves the common problems in plant construction such as budget overrun, schedule delays, unqualified equipment, unclear recovery benefit, disputes of the suppliers, and unclear responsibility of after-sale service. We have been dedicated to provide more professional beneficiation plant EPC service for customers, and constantly improves and optimizes their own service, formed a set of our own service system. We have the confidence to ensure the every step of EPC project can be carried out smoothly for customers. Engineering design After reaching an agreement with customer, we start to organize a working team for the engineering design, including: planning, investigation, data collection, planning and optimization, project evaluation, report writing, and form a formal report after exchanging views with customer. By the data collection and the feasibility study from the various professionals, a feasible plan for the plant construction would be finally made, and the " Feasibility Study Report " shall be submitted to the relevant departments. After "Feasibility Study Report" approved, the design team starts the preliminary design and comes up with the design scheme of beneficiation plant construction. The design mainly involves: beneficiation, general layout, electric power, communication, civil engineering, environmental protection, water supply and drainage, tailings, safety and fire protection, investment estimates, economic benefit. When the preliminary design is approved, The design team starts to make working drawings. When the working drawings completed, the designers must hand the drawings over to the construction officers, especially give instructions about construction details.
City:Nanjing[CN] 
Location:
 
Apr 03 2018Magnetic Separator,iron remover334
Apr 03 2018Beneficiation Plant EPC,Mineral processing plant engineering and construction335
Apr 03 2018SY-Flotation machine,flotation cell374
Apr 03 2018Dry type ball mill,grinding mill336
Apr 03 2018Jaw crusher,stone crusher,crushing machinery333

return back

Copyright © toextrade Inc. All rights reserved. Contact us